JK Remodel
Monday, January 7, 2013
Releveling floor.
Interior drywall mud and taped ready for texture
Exterior shots after painted
Thursday, January 3, 2013
Outside siding complete and primed.New window installed.
Insulation on second inner wall.
Electrical wiring rough in signed off by the city of Kirkland
Framing shots and electrical rough in signed off.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)